Updated on 2024/04/24

写真a

 
KANO, Naruo
 
Affiliation
Faculty of Science and Engineering
Job title
Professor Emeritus
Degree
工学博士 ( 早稲田大学 )

Professional Memberships

  •  
     
     

    日本建築学会

  •  
     
     

    土木学会

Research Areas

  • Architectural planning and city planning

Research Interests

  • 建築生産、工事管理、建築産業、建設産業

Awards

  • 日本建築学会賞(論文)

    1995  

 

Papers

  • 建築工事における写真画像とVR画像を用いた進捗管理に関する研究

    金炯垠, 嘉納成男, 蔡成浩

    日本建築学会計画系論文集    2006.01

  • Best Paper Award

    蔡成浩, 嘉納成男

    1st International Conference on Construction Engineering and Management, 2005    2005.10

  • 日本と韓国における建築工事管理者の業務比較に関する研究

    李垠錫, 嘉納成男

    日本建築学会計画系論文集    2005.02

  • VR技術を用いた現場写真の活用化-現場写真における3次元座標の推定方法に関する研究

    金炯垠, 蔡成浩, 嘉納成男

    情報システム利用技術シンポジウム論文集    2004.12

  • A Study on the Application of VR Technique to Building Construction-Comparisons of Site Photo and VR Image in Construction Progress-

    金炯垠, 蔡成浩, 嘉納成男

    21th International Symposium on Automation and Robotics in Construction     431 - 436  2004.09

  • AN ESTIMATING METHOD OF WORKER’STASK WITH 6-DOF SENSORS

    蔡成浩, 嘉納成男

    21th International Symposium on Automation and Robotics in Construction     531 - 536  2004.09

  • 建築工事における作業管理に関する研究-作業内容の推定方法を用いたモニタリングシステムの開発-

    蔡成浩, 嘉納成男, 中村隆寛

    第10回建設ロボットシンポジウム論文集     317 - 324  2004.09

  • バーチャル建設現場システムの開発-3次元CAD情報に基づく部材取り付け順序の推定-

    嘉納成男, 金炯垠, 細田正紀

    第10回建設ロボットシンポジウム論文集     239 - 246  2004.09

  • 建築工事における三次元シミュレーションに関する研究-建設現場周辺の日照環境シミュレーション-

    宮本貴之, 蔡成浩, 嘉納成男

    日本建築学会大会学術講演梗概集     1295 - 1296  2004.08

  • 建築工事における三次元シミュレーションに関する研究-作業者の作業モデルの作成-

    香川洋平, 蔡成浩, 嘉納成男

    日本建築学会大会学術講演梗概集     1293 - 1294  2004.08

    CiNii

  • 三次元アニメーションを用いた作業の適合性の評価に関する研究

    川村慶輔, 蔡成浩, 嘉納成男

    日本建築学会大会学術講演梗概集     1291 - 1292  2004.08

  • 建設工事におけるバーチャルリアリティ技術への期待

    嘉納成男

    建設の施工企画    2004.07

  • CMrとVE提案の技術

    嘉納成男

    日本CM協会    2004.07

  • バーチャル建設現場システムの開発-情報と物との融合に基づく工事管理-

    嘉納成男, 金炯垠

    第20回建築生産シンポジウム論文集     299 - 304  2004.07

  • 建築工事における生産性に関する研究-壁下地取付け作業の作業姿勢の分析による身体負荷の算出方法-

    蔡成浩, 嘉納成男, 中村隆寛

    第20回建築生産シンポジウム論文集     239 - 245  2004.07

  • 新工法の開発における作業方法の評価に関する研究-作業のし易さと作業時間の評価値について-

    蔡成浩, 嘉納成男

    日本建築学会計画系論文集   69 ( 581 ) 127 - 134  2004.07

     View Summary

    This paper discussed on the evaluation of building works with the priorities of decision. Two axis of evaluation were selected for the comparison cease of working and clabor productivity because they share the property of being the most fundamental factors in the building works. The pair-wise comparison with the Analytic Hierarchy Process (AHP) and the Maynard Operation Sequence Technique (MOST) are applied for the estimate of cease of working and clabor productivity. The authors estimated the priorities of the six-alternatives in partition wall works. The differences between the priorities were evaluated, and it was clarified that the method is applicable to the decision in planning work methods.

    DOI CiNii

  • 建築工事における工程の計画と管理指針

    日本建築学会    2004.02

  • 建設分野へのロボット導入の課題と将来展望

    嘉納成男

    建設の機械化    2004.01

  • 建築生産におけるVR技術の活用化に関する研究-リアル画像のシステムへの応用-

    金炯垠, 蔡成浩, 嘉納成男

    日本建築学会情報システム利用技術シンポジウム論文集   ( vol26 ) 1 - 4  2003.12

  • 建築市場・建築産業の現状と将来 特別委員会中間報告

    嘉納成男

    日本建築学会建築雑誌    2003.11

  • 建築工事における作業方法の開発に関する研究-問題点辞書の作成とそれを用いたアイデア発想法-

    川村慶輔, 蔡成浩, 嘉納成男

    日本建築学会学術講演梗概集F-1   ( Vol.2003 ) 1087 - 1088  2003.09

  • 建築工事における作業方法の開発に関する研究-技術開発における目的の分析と発明原理の抽出-

    中村隆寛, 井野昭夫, 蔡成浩, 嘉納成男

    日本建築学会学術講演梗概集F-1   ( Vol.2003 ) 1089 - 1090  2003.09

  • 鉄骨工事現場の作業実態に関する研究

    李垠錫, 嘉納成男

    日本建築学会学術講演梗概集A-1   ( Vol.2003 ) 3 - 4  2003.09

  • 判断のための評価の仕方

    嘉納成男

    日本CM協会    2003.08

  • コストパーフォマンスの向上に資するVE

    嘉納成男

    基礎工    2003.07

  • バーチャル建設現場システムの開発 建築工事の可視化シミュレーション

    嘉納成男, 細田正紀, 香川洋平, 田村尚希, 宮本貴之

    第19回建築生産シンポジウム論文集     95 - 102  2003.07

  • 建築工事における生産技術に関する研究-特許情報の解析に基づく生産技術の着眼点と原理-

    井野昭夫, 嘉納成男

    第19回建築生産シンポジウム論文集     203 - 210  2003.07

  • 資源循環型集合住宅のライフサイクルコストの評価 資源循環型社会に向けた住宅システムの経済性評価に関する研究

    五十嵐健, 嘉納成男

    日本建築学会計画系論文集   68 ( 568 ) 101 - 108  2003.06

     View Summary

    This research deals with the economical advantage of condominium, which permit resources circulation for a better sustainable society. We set up a model of renewal cost, which can respond to user's life stages, and calculate the life cycle cost for 180 years using the present value method. The result of this study has convinced us that the resource circulation housing provides an economical advantage, e.g. while its cost is 20% higher than the conventional housing the real rate of interest is 2%, which will give an advantage of 20% over conventional housing. And that its inheritor has an economical advantage in the life span cost, to be 40% lower than the original builders.

    DOI CiNii

  • 建築工事における作業内容の推定に関する研究-6自由度データに基づく構成動作推定方法-

    蔡成浩, 嘉納成男

    日本建築学会計画系論文集   68 ( 564 ) 295 - 302  2003.02

     View Summary

    This paper discussed on the estimation of building works with 6-DOF motion sensors. The 6-DOF (Degree-of-freedom) sensor captures 3-axis acceleration and 3-axis angle. The actual data on the sensors is computed to the feature parameters in each time-unit for the recognition of the work motions. The neural network is applied for the method of the recognition. The neural network model is designed in the three layers Back-propagation network with the standard connections. The neural network outputs show guidelines to select the work motions. The authors collected the 6-DOF motion data in partition works, and estimated work motions based on those data. The differences between the actual and the estimated motions were evaluated, and it was clarified that the method is applicable to estimate work motions in building works.

    DOI CiNii

  • 建築工事における生産性に関する研究-6自由度データを用いた作業内容の推定方法の提案と検証-

    蔡成浩, 嘉納成男, 高田博尾, 八木淳一

    日本建築学会学術講演梗概集     983 - 984  2002.09

  • 建築工事における作業推定システムに関する研究

    蔡成浩, 嘉納成男

    第18回生産シンポジウム論文集     201 - 208  2002.07

  • バーチャル建設現場システムの開発 プロトタイプシステムの開発とその開発課題

    嘉納成男, 八尾唯二, 細田正紀

    第18回生産シンポジウム論文集     67 - 72  2002.07

  • 建築工事における作業推定システムに関する研究

    蔡成浩, 嘉納成男

    第18回生産シンポジウム論文集     201 - 208  2002.07

  • 大型鉄骨の移動及び設置工法に関する研究-韓国の事例について-

    李垠錫, 嘉納成男

    日本建築学会学術講演梗概集     131 - 132  2002.06

  • 資源循環型社会に向けた住宅生産システムの経済性評価に関する基礎的研究

    五十嵐健, 嘉納成男

    日本建築学会計画系論文集   ( 555 ) 279 - 286  2002.05

    DOI

  • 建築工事における生産性に関する研究-作業方法の選択プロセスの開発-

    蔡成浩, 嘉納成男

    第17回建築生産シンポジウム     265 - 272  2001.07

  • 鉄骨工事における生産システムに関する研究-日本と韓国の職長に対するアンケート調査結果と分析-

    李垠錫, 嘉納成男

    第17回建築生産シンポジウム論文集     273 - 280  2001.07

  • 建築工事における生産性に関する研究 —生産プロセスの具現化

    蔡成浩, 早稲田大, 嘉納成男

    F-1分冊     1123  2001

  • アンケート調査からみるコンストラクションマネジメント(CM)方式に対する発注者の意識の変革

    小菅健, 嘉納成男

    F-1分冊     1103  2001

  • 鉄骨工事における職長の意識に関する研究 —日本と韓国の職長に対するアンケート調査結果と分析

    李垠錫, 嘉納成男

    A-1分冊     881  2001

  • 工事計画における創造的計画手法の開発(その2) 工事プロセスの機能分析と機能展開

    嘉納成男, 安藤幹朗

    第16回建築生産シンポジウム論文集     243 - 250  2000.07

  • 建築工事における生産性に関する研究-鋼製間仕切壁工事における作業時間の推定方法に関する研究-

    蔡成浩, 嘉納成男, 末弘貴久

    第16回建築生産シンポジウム論文集     175 - 182  2000.07

  • 都市における建設活動で発生する公衆災害に関する研究-アンケートによる調査に基づく現状分析-

    嘉納成男, 外前田衛

    第16回建築生産シンポジウム論文集     45 - 52  2000.07

  • 建築工事における生産性に関する研究 ─ 鋼製壁下地工事の運搬作業の数量化による時間推定─

    蔡成浩, 嘉納成男

    F-1分冊     1335  2000

▼display all

Books and Other Publications

  • 未来を拓く新しい建築システム

    嘉納成男

    建築技術  2006.01

  • 建築産業再生のためのマネジメント講座

    早稲田大学出版  2005.09

Research Projects

  • Study of long-life house for stock-type housing promotion that will contribute to a sustainable society

    Japan Society for the Promotion of Science  Grants-in-Aid for Scientific Research

    Project Year :

    2011
    -
    2013
     

    IGARASHI Takeshi, KANO Naruo, ARIKAWA Satoshi

     View Summary

    In this study, in order to study the spread of measures stock-type housing, we conducted a questionnaire survey of producers of long-life housing. As a result, the common subject matter is often the technology for implementing constitute a stock-type housing, and low environmental impact and long-term use, implementation of housing that satisfies both is possible, it has been found that evaluation of the purchaser is also high. In addition, as a result of the door-to-door survey of business who are engaged in activities that make the region timber it, it was found that it is possible to put in place regional distribution processing system that continuously from timber production is effective for the dissemination .

  • Study of Quality Records and Inspections Using Photographic Measurement Methods with Stereo-Camera Images

    Japan Society for the Promotion of Science  Grants-in-Aid for Scientific Research

    Project Year :

    2010
    -
    2012
     

    KANO Naruo

     View Summary

    Photographic measurement based on the principle of a stereocamera has been regarded as a conventional technology. Now, with the appearance of digital cameras, it is considered to be one of the extremely important measuring technologies for buildings with complicated shapes. This study, based on various measuring experimental results, develops not only a basic technology for recording and inspection of building quality, but also a prototype of computer systems for quality management using photographic images.

  • Three Dimensional Data Acquisition and Comparison with CAD Models for Quality management of Building Components

    Japan Society for the Promotion of Science  Grants-in-Aid for Scientific Research

    Project Year :

    2009
    -
    2011
     

    KANO Naruo, KIMOTO Kenji, IGARASHI Takeshi

     View Summary

    To use the point cloud obtained by the 3D scanner for quality management, the authors have applied the point cloud analysis method and the comparison method of point cloud and 3D CAD models to the actual reinforcing work. As a result of the research, the authors have systematized the 3D CAD method to reduce the reinforcement model, and developed the method to neglect point cloud noise as well as the method to extract reinforcing bars from point cloud. Thus, they have verified the possibility of the comparison between 3D CAD models and the point cloud models.

  • A study of instructional system for fostering and safety of construction workers

    Japan Society for the Promotion of Science  Grants-in-Aid for Scientific Research

    Project Year :

    2005
    -
    2007
     

    KANO Naruo, CHAE Soungho

     View Summary

    In this research, the fostering of skilled worker and reducing the number of accidents were defined as the objectives, then the development of a monitoring system for accident prevention and an instruction manual for fostering skills was conducted. The followings are the results.
    1) Development of process model for past accidents
    Past accident samples were reflected and models of accident process were created. The factors of accident were extracted from the each model of falling and collision. The effectiveness of the extracted factors for design of accident prevention measure was verified.
    2) Recording of work motion data with the motion capture system
    The motion data of a skilled worker was collected with the motion capture system and a method to create a computer animation from the motion data was built. Moreover, an automated estimation system of workload from the motion data was proposed and the experimental results were verified.
    3) Monitoring of work situation with the stereo camera
    The stereo camera method which captures the movement data of heavy equipment and worker on the construction site was selected as a monitoring system. The actual site experiment was conducted and the collected 3 dimensional position data was used for estimation of dangerous situation.
    4) Development of the functions to design the technical manual
    The method of System Approach was applied to development of instructional design and an analysis method of work process.
    5) Design of a technical manual with the digital contents
    A technical manual for steel partition work which based on the instructional analysis was proposed. The manual was made from multimedia such as sounds, images, 3-D models, texts and other information. The practical utility and the observation were evaluated.

  • Comprehensive Research on the Present and Future of Building Construction Market and Industry

    Japan Society for the Promotion of Science  Grants-in-Aid for Scientific Research

    Project Year :

    2002
    -
    2004
     

    KANO Naruo, MIYAKE Jun, ENDO Kazuyoshi, TAJIMI Sakon, ANDO Masao, YASHIRO Tomoya

     View Summary

    This research project, consisting of surveys, hearings, analyses, and studies on building construction market, building construction industry, and professional skills in building construction, has been conducted for three years, and was finalized in 2004.
    In the research on the building construction market, the statistical trends of housing demand and non-housing demand was investigated. At the same time, the relationship between the statistical data and the current background as well as the future trend of building construction demand was studied. The results of analysis of the relationship between building construction demand and GDP in various countries reveal that the housing demand is likely to severely decline in the future, whereas the non-housing demand that has remained sluggish these days is not likely to further decline. Moreover, it, is pointed out that the building construction industry should prepare with the building stock society.
    In the research on the building construction industry, changes in the reliability between owners and general contractors as well as changes in their position in negotiations were analyzed. It is revealed that, owners have thrown full responsibility on general contractors, though building construction work has been conventionally carried out under the control of the contractors. The analytical results also show that such a system is now changing due to a change in owners' awareness on building purchasing. A possibility of structural change in the building construction industry is also suggested. It is pointed out that owners' position in ordering might gain more importance during such a structural change.
    In the research on the professional skills for building construction industry, it is revealed that the demand for various professional skills required for construction project of new buildings will decline, while the demand for professional skills targeted at the building stock market will increase In accordance with a change in a balance between supply side and demand side for professional skills in building construction, it is expected that the content of adult retraining and university education should be changed. It is also pointed out that the need for new professional skills will be highly expected not only for the support tasks for owners but also for a wide variety of building construction activities.

  • International Comparison of Procurement and Management of Construction Project

    Japan Society for the Promotion of Science  Grants-in-Aid for Scientific Research

    Project Year :

    1998
    -
    2000
     

    FURUSAKA Shuzo, ANDO Masao, KANO Naruo, KUNISHIMA Masahiko, KANETA Takashi

     View Summary

    This research program describes the framework of procurement and management of construction projects through international comparison. The countries this research targeted are the 5 developed countries : Japan, the United States, Great Britain, France, and Canada. The research was divided into the field survey and the discussion of the construction project. In the field survey, the investigation was executed by using the format common to each project. Large-scale projects such as power plants, tunnels, bridges, international airports, and complex buildings are included in the construction project. Each project was analyzed and discussed from the views of (1) feasibility study of the business plan, (2) project financing, (3) project organization, (4) project management (5) risk and uncertainty, (6) information systems, and (7) corporate strategies. The project data collected in each country was examined. A remarkable difference in the background of historical details, culture, the commercial custom, and industry is found in the method of management in each country. The execution of the project is esteemed when the enterprise and the production system of another country are brought in and the method of management is esteemed. For instance, the international movement is mutual of architect attestation, and mutual of professional engineer attestation. A lot of findings were obtained from these trends. It appears remarkable difference though the management method in each country. The problem is caused mutually in the region where the firms from the developed country are committing to a project overseas.

  • A STUDY ON CONSTRUCTION MANAGEMENT IN A BUILDING PROJECT

    Japan Society for the Promotion of Science  Grants-in-Aid for Scientific Research

    Project Year :

    1992
    -
    1993
     

    KANO Naruo

     View Summary

    The word "CM (Construction Management)" has been used frequently these days. CM is an inevitable subject for rebolution in construction industry.
    However, this form of contract which is prevalent in Western countries has many unfavorable aspects for Japanese construction industry. Taking into consideration the nature of Japanese construction industry, its culture, and its custom, it is a little too hasty to conclude that the Western-style CM will become the mainstream in the form of contract in Japanese construction industry. It is more important ot think about Japanese-style Cm method which is suited Japanese construction industry.
    In this research, the survey was conducted on CM method in construction project anonymously. Two thousand major companies in Japan were chosen clarify clients' needs and options on the following items : (1) An outline of the company ; (2) A division in charge of construction project ; (3) the recent situation of construction work ; (4) Requests to design firms and construction companies ; and, (5) Opinions on the new form of construction contract.
    Looking at the answers obtained from about 400 companies, it is clear that clients are strongly interested in CM method and many of them are likely to conseder whether to adopt CM method in the future. These answers also suggest that all employers are not completely satisfied with design firm and construction companies ; there is much room for improvement. In addition, hearings from construction companies and consultants as well as the present CM situation in the U.S.were analyzed to clarify the possibility for responding clients' needs and the opinions on Japanese-style CM method.

  • A Study on the Appropriate Construction Period of Building Projects

    Japan Society for the Promotion of Science  Grants-in-Aid for Scientific Research

    Project Year :

    1988
    -
    1989
     

    TAMURA Yasushi, KANO Naruo

     View Summary

    This study aims at estimating the appropriate construction period of building projects based on the statistical analysis of construction records and computer technologies.
    The statistical investigations on construction records were carried out with two different sources: records from an architect office and records from major contractors. The former records were selected from the piles for last twenty years and multiple-regresion analysis with nine attributes resolved formula to estimate statistical periods according to the structural type and the scale of the projects. The later records were also applied to the multiple-regression analysis and the relationship between the actual value and the estimated value in each construction process were studied.
    The results on statistical analysis were utilized in the database for a knowledge-based system, which was implemented for planning and scheduling of construction process by using the work packages and process packages. As a empirical test, the system was applied to estimate the construction period of a given building project, and pursued the feasibility of the expert system for estimating appropriate construction periods.
    Furthermore, the concept of estimating construction periods was developed to lead the philosophy of optimizing construction periods, and the database for construction records and system simulations of construction process were also investigated.

  • 中国・韓国にみる日本的建設プロジェクトマネジメントの強みと弱みに関する研究

    科学研究費助成事業(京都大学)  科学研究費助成事業(基盤研究(C))

  • 建築システムの高度化に関する総合的研究

    文部科学省 

▼display all

 

Internal Special Research Projects

  • 鉄筋コンクリート躯体における配筋の品質確保技術に関する研究

    2015  

     View Summary

    建築物の鉄筋コンクリート工事について、工事現場のタワークレーンの上から撮影した写真画像を多視点画像法を用いて点群モデルに変換した後、鉄筋部材の位置や出来形の把握を行う技術を開発した。実験では、工事現場を約50枚程度の写真画像から点群モデルを造りだして、下記に示す解析方法を確立した。  (1) 点群モデルとCADモデルとの照合による位置品質の検査技術 (2) 点群モデルからCADモデルには登録されていない資材等の特定技術 (3) 点群モデルの差分による進捗の把握技術 (4) CADモデルに基づく部材の接合関係の摘出技術  (5) 点群の差分結果による出来形の判定技術本技術は、3次元CADシステムであるMIcroStation内のVBAを用いて、そのプロトタイプシステムを開発して、その有用性を実証している。

  • 鉄筋工事の品質検査を目的とした3次元スキャナー計測と設計図の自動照合に関する研究

    2012  

     View Summary

     本研究では、鉄筋工事における品質管理を3次元スキャナーによる点群を解析することによって、実施する技術の開発を目的とした。 研究では、実際の工事現場で計測した点群について以下の操作を行う技術を開発した。 (1)計測した点群について、鉄筋の後部に発生するノイズを除去する技術 (2)柱や梁の鉄筋が網状に複雑に組み合わさっている状況について、それを構成する鉄筋を特定して、それぞれの鉄筋を取り出す技術 (3)柱や梁から取り出した鉄筋の点群に基づいて、鉄筋の径を求める技術 なお、本研究では、建築工事で使用する鉄筋の柱や梁をほぼ3mm間隔で計測することを前提とした。 上記のシステム開発は、3次元CADであるMicroStationのAdd-inのプログラムとして作成した。3次元CADにおいて、数百万の点群を読み込むと、CADシステムの操作が緩慢になるため、点群はすべてバックグラウンドのメモリー上に保管し、必要に応じてその一部の点群をCAD画面上に表示して、その形状の確認や処理に必要な点群の領域を定めるようにした。 本研究の成果から、鉄筋を3次元スキャナーで計測することによって、その鉄筋の径および鉄筋の間隔を品質検査に十分な精度で、正確に把握することができることを確認した。また、複雑に配筋された柱や梁においては、手前の鉄筋によって、背後の鉄筋が隠れる現象が起こるため、少なくとも4か所程度から3次元スキャナーで計測する必要があることが分かった。また、現在では、型枠を組みながら鉄筋を配筋することも行われるため、2方向程度からしか計測できない場合もある。このため、3次元計測を前提とした検査方式では、配筋の方法を変更して、配筋が完成後に周囲から配筋状態を計測し得る仕組みが必要であると言える。これを行うことによって、鉄筋の検査を従来のようにヒューマンエラーが介在する可能性がある管理者による目視の検査方法から客観的なデータに基づく品質管理が可能になると考えられる。

  • 建築生産に関する写真・動画教材の作成とホームページへの掲載

    1999  

     View Summary

     本研究では、建築生産に関する授業に係わる教材の電子化を図り、その授業での運用を行った。 先ず、従来からある研究室にストックしていた建築生産に係わる写真についてその殆どを電子化及びキーワード付けを行い、ホームページ(www.kano.arch.waseda.ac.jp)上に掲載した。さらに、そのホームページを実際に教室で参照し、授業の進捗に合わせ、学生へ実際工事の仕組みや状況について目で見る教育を行った。 さらに、動画については、研究室で作成した教育用のビデオ及び外部機関が作成したビデオを試験的に動画ファイルに変換して、それを特定のIPアドレスからのみアクセスし得るホームページ上でRealPlayを用いて閲覧できるようにした。 上記の授業での試行によって、以下の点が明らかになった。(1)教室のLAN端子から研究室のサーバーにアクセスをすることによって、多くの写真教材を効果的に学生に見せることが出来、その教育効果は高い。(2)動画については、既存のソフトを使用することによって、学生に閲覧させることが出来たが、現状の通信速度では、その画素が少なく、詳細な部分についての表示が不明確になり、教室での閲覧ではなく、各自のパソコンからのアクセスが効果的であった。(3)写真について、原画がコピーで流出することが有り得るため、建築工事における災害事例や欠陥部分の写真など、そのホームページ上における掲載に支障がある。(4)動画については、コピープロテクトを設定することが出来るため不正コピーの問題はない。(5)動画の多くは、ビデオ媒体で有料または寄贈によって研究室で保有している。このため、教室でビデオ媒体を用いて上映する上では何ら問題ないが、これを動画ファイルに変換して閲覧させる場合、著作権の問題が発生し、その運用が事実上難しい。 以上で述べた研究成果により、今後解決すべき事項はあるものの、この研究で作成した写真・動画教材は関連授業において有効に活用し得、また教育効果も大きいことが明らかになった。

  • 建築生産における工程計画情報の活用に関する研究

    1996  

     View Summary

     本研究は、工程計画をめぐる各種の情報について有効に活用する仕組みを検討するとともに、その情報の収集とデータベースの構築を実際に行い、情報提供の試行実験を実施することを目的としている。 建築工事における工程計画においては、工事の特徴を把握するとともに、施工時において検討しなければならない多種多様な条件を考慮して、その計画を立案する必要がある。しかし、この計画段階において有効な情報支援の体制及びその仕組みは未だ確立していない状況にある。 本研究では、Internetによるwwwの情報提供の方法に着目し、現在建設企業で進められているイントラネットの動向に対応して、wwwの技術を活用した建築生産情報の提供の仕組みについて、実際のデータベースを作成し、その情報提供システムの運用を行った。データベースとしては、建築生産に関連する技術書や論文等について1950年から現在(1995年)までの文献約15,000件を収集し、そのデータベースを作成した。さらに、全国に工事現場が散在することを想定して、このデータベースをWWW上において、検索・提供するシステムを構築し、その実際の運用実験を行った。その結果、wwwを用いた情報提供によって、遠隔地においても容易に有用な情報を見つけ出すことができ、その効果が大きいことが明らかになった。本データベースは、この実験以後、本大学内及び他の教育機関に対しwwwを通じて一般に公開(http//:www.kano.arch.waseda.ac.jp)しており、高い評価を外部から得ている。